Optimasi Kinerja Simpang Bersinyal Pada Simpang Lima Dengan Metode Fuzzy Logic

Authors

  • Daffa Putra Z Universitas Pamulang
  • Muhammad Ikbal S Universitas Pamulang
  • Muhammad Indra P Universitas Pamulang
  • Rival Septeawan Universitas Pamulang

Keywords:

Optimal, Kinerja Lalu Lintas, Logika Fuzzy

Abstract

Transportation issues emerge when the expansion sought after isn't trailed by the stock of framework that upholds transportation. This condition for the most part happens in metropolitan regions, making it a significant issue today. Similarly as with Bandung City, as one of the Public Action Communities (Unofficial law No. 47 of 1997), making it a city with an elevated degree of action. Restricted assets have been recognized as the primary obstruction in giving transportation framework. Alluding to the restricted assets, it is feasible to enhance and work on the presentation of existing foundation and supporting offices. Signalized convergences that have long postponements and long lines are one of the frameworks that should be gotten to the next level. The condition that should be considered is that the approaching current to the crossing point has high changes, making the game plan of signalized convergences with the regulator conceivable not exactly ideal. Crossing point control in view of current variance should be created. It is trusted that this advancement can diminish postponements and lines, to further develop crossing point execution and decrease complete travel time. The improvement of this framework will be completed utilizing Fluffy Rationale. This hypothesis is exceptionally helpful in utilizations of poorly organized ID and control frameworks, where linearity and time invariance are dubious. The improvement of this framework starts by planning a strategy for deciding the planning of a variable sign at a signalized convergence in view of fluffy rationale. Then it will be gone on with the plan of a PC program for the methodology for deciding the planning of a variable sign utilizing MATLAB 7.0 programming. With the sign timing of this fluffy strategy, an investigation of the subsequent presentation for the crossing point will be done. Then the outcomes will be contrasted and one of the decent sign timing techniques, specifically MKJI. So it very well may be seen the better execution results between the two. After the framework improvement and investigation were completed, it was presumed that the presentation produced by the fluffy strategy signal time was superior to MKJI. It is obvious from the subsequent exhibition boundaries, in particular a more modest deferral. The postponement at the crossing point and still up in the air by MKJI is 50.3 seconds, while the sign season of the fluffy strategy is 39.69 seconds. This outcome will goodly affect traffic. So it should be concentrated on top to bottom, with the goal that it very well may be utilized as an answer for conquer the issue of blockage in large urban communities.

References

Adhitya Yoga Yudanto, M. A. (2013). ULTIMATICS. Optimalisasi Lampu Lalu Lintas dengan Fuzzy Logic, 58-62.

AFANDI, A. (2018). ANALISIS SIMPANG BERSINYAL MENGGUNAKAN LOGIKA FUZZY. Diambil kembali dari Perpustakaan Digital ITB: https://digilib.itb.ac.id/index.php/gdl/view/6994

Ayu Putro Aji, A. A. (2019, Oktober 1). Optimasi Kinerja Simpang Bersinyal Dengan Metode Fuzzy Logic Pada Simpang Lima Diponegoro Kota Madiun. Diambil kembali dari ejournal kahuripan: https://www.ejournal.kahuripan.ac.id/index.php/TECNOSCIENZA/article/view/255/207

Yudanto, A. Y. (2013, Desember 01). Optimalisasi Lampu Lalu Lintas dengan Fuzzy Logic. Diambil kembali dari ULTIMATICS: https://ejournals.umn.ac.id/index.php/TI/article/view/322

Published

2023-06-04

How to Cite

Putra Z, D. ., Ikbal S, M. ., Indra P, M., & Septeawan, R. . (2023). Optimasi Kinerja Simpang Bersinyal Pada Simpang Lima Dengan Metode Fuzzy Logic. BISIK : Jurnal Ilmu Komputer, Hukum, Kesehatan Dan Sosial Humaniora, 1(3 : Oktober), 204–209. Retrieved from https://journal.mediapublikasi.id/index.php/bisik/article/view/419